Methodist South Hospital Entry Renovation
Enclosed the existing entry canopy with a new façade and added a new entry canopy. The scope included design of the footings, slabs, stud walls, roof framing, and floor framing.
-
$2,300,000
Budget
-
2013
Construction Completed